My condo board has to approve it

Let the constraints do some of the design work.

Co-op and condo renovation in DC, Maryland and Virginia. The limits are where the plan starts.

Co-op and condo Washington DC · Maryland · Virginia
Urban Oasis500 sf studio · Harbour Square, SW Waterfront, DC
Apartments built inside the building's rules
The Long View, a co-op renovation at the Southwest Waterfront, Washington DC
Co-op
Yes, the board will approve it.
The Long View · SW Waterfront, DC
Urban Oasis, a 500 square foot studio renovation at Harbour Square, Washington DC
500 sf studio
Trade the whole house for its smartest part.
Urban Oasis · Harbour Square, SW Waterfront, DC
See all fourteen projects  →
What decides it

Plumbing and vent stacks are usually common elements and usually immovable, which sets where wet rooms can be. In many buildings the slab cannot be cored or chased, so anything requiring new drainage has to work above it.

The alteration agreement is a design document, not paperwork. It typically governs flooring assemblies, acoustic requirements, work hours, insurance and who carries liability, and reading it early prevents redesign later.

What the design solves

The plan is rebuilt around the fixed points rather than against them. Thickened walls absorb storage. Cabinetry takes over the job partitions used to do. Circulation is compressed so rooms can be generous.

Five hundred square feet can hold a kitchen, an office, room to entertain and a bed when the storage is designed rather than added.

What you end up with

Board packages have their own conventions, and a drawing set that answers the reviewer's questions before they are asked moves faster than one that is merely beautiful.

Approval is the deliverable. A design that cannot be built in that building is not a design.

↑ Back to the co-op and condo menu

Questions owners ask first

In a co-op you own shares and a proprietary lease rather than the unit itself, so the board's control over alterations is typically broader and the approval process more involved. In a condo you own the unit, with common elements defined by the declaration.

In practice both require an alteration agreement, an approved drawing set, insurance and a licensed contractor. The co-op process is usually the longer of the two.

Sometimes, and it depends entirely on the stacks and the slab. If drainage can reach an existing stack at the required slope without cutting structure, it can be possible. If it cannot, no design solves it.

This is the first thing to test, before layout, because the answer determines the whole plan.

It varies by building, and it is driven by the board's meeting schedule as much as by the review itself. Some review monthly, some quarterly, and an incomplete submission means waiting for the next cycle.

Building the submission correctly the first time is the only reliable way to speed it up.

Most buildings require drawings stamped by a licensed architect or engineer for anything beyond cosmetic work, and many require it regardless.

Beyond the requirement, the constraints in an apartment are exactly the kind that reward being resolved on paper. There is very little room to improvise in the field.

↑ Back to the co-op and condo menu
Resources and insight articles
Tools and resources

Have an alteration agreement to get through?

Calculators, checklists and downloadable guides that answer the practical questions before you commit to anything. Send the building's rules before the plan. They decide what the plan can be.

Co-op and condo tools and resources  →

Rather talk it through? Start with one question.

Insight articles

Short reads on how this actually works.

Written from projects that have been through review and built, not from general advice.